Opened Fall 2005; nine two-story suite buildings for continuing students, ~600 beds.
Tuolumne opened Fall 2007 and Mariposa Fall 2008; suite-style for freshmen, ~400 beds total.
Opened Fall 2010; corridor-style halls for freshmen, ~600 beds combined.
Opened Fall 2013; five-story, traditional corridor layout, ~530 beds.
Opened Fall 2018; four-story layout, ~430 beds.
Opened Fall 2018; ~800 beds with academic/social spaces.
Opened Fall 2021; ~600 beds, modern mixed-use design.
Opened Fall 2021; ~600 beds, five-story suite/quadrangle design.
| Hall | Opened | Beds |
|---|---|---|
| Valley Terraces | 2005 | 600 |
| Tuolumne | 2007 | 200 |
| Mariposa | 2008 | 200 |
| Cathedral | 2010 | 300 |
| Tenaya | 2010 | 300 |
| Half Dome | 2013 | 530 |
| Granite Pass | 2018 | 430 |
| Glacier Point | 2018 | 800 |
| El Portal | 2021 | 600 |
| Sentinel Rock | 2021 | 600 |